Sprint Report

This report shows sprint-level metrics including story points committed, completed, added, and removed. It gives agile teams a clear picture of how well each sprint was planned and executed, and how scope changed during the sprint.

Start a report

  1. Go to Apps → Dashlytics in the Jira left sidebar, then click Home.
  2. Click Open Builder, then New in the toolbar, to start from a blank report.
  3. In the Data Source section, enter a JQL query scoped to the project whose sprints you want to report on — project = <your project key>, with your own key in place of the placeholder. Click Search.
  4. Click the Configure button to open the Configure report dialog.

Lay out the report

  1. In the Layout Designer tab, drag Work Item from the Dimensions list (1) into the Rows zone (3), so each work item becomes a row.
  2. Drag Sprint into the Filters zone (2), so readers can select which sprint to view.

Layout Designer with the Dimensions list, the Filters zone and the Rows zone numbered, Sprint in Filters and Work Item in Rows

Add the Metrics

  1. Go to the Add Metrics tab. In Available Metrics (1), expand Sprint Story Points Metrics.
  2. Click + Add on each Metric you want. They appear under Selected Metrics (2), and become the report's columns in that order:
  • Sprint Story Points Committed — story points at the start of the sprint.
  • Sprint Story Points Completed — story points completed by the end of the sprint.
  • Sprint Story Points Added — story points added during the sprint.
  • Sprint Story Points Removed — story points removed during the sprint.
  • Sprint Story Points Completed from Commitment — story points completed out of those originally committed.

Add Metrics tab with Available Metrics and Selected Metrics numbered, the sprint story point Metrics selected

  1. Click Apply to close the dialog and render the report.
  2. Use the Sprint filter chip above the report table to select the sprint you want to view.
  3. Click Save as in the toolbar, enter a report name, and click Save report.

Result

The top row totals the sprint; expand it to see each work item's contribution. A dash means the work item carried no points for that Metric.

Sprint report table totalling committed and completed story points, expanded to show each work item

For AI agents: the complete documentation index is available at https://dashlytics-docs.vivek-fitkariwala.workers.dev/llms.txt, the full documentation bundle is available at https://dashlytics-docs.vivek-fitkariwala.workers.dev/llms-full.txt, and this page is available as Markdown at https://dashlytics-docs.vivek-fitkariwala.workers.dev/use-cases/jira-software/sprint-report/index.md.